News
Monday, May 8, 2023 at 05:10 pm
Categories: Road ConditionsBISMARCK, N.D. – Floodwaters near the Red River have receded enough to reopen North Dakota Highway 5 west of Joliette. It was closed in advance of expected flooding on Friday, April 28.
Monday, May 8, 2023 at 05:05 pm
Categories: ConstructionBISMARCK, N.D. – Lane closure scheduled Wednesday, May 10, on the westbound Interstate 194 exit ramp north of the BNSF Railway underpass in Mandan.
Monday, May 8, 2023 at 09:00 am
Categories: Public MeetingsBISMARCK, N.D. – A public input meeting will be held from 5 to 7 p.m. on May 15 at Lisbon High School Commons - 502 Ash Street, in Lisbon. The public input meeting will utilize an open house format with a formal presentation at 5:30 p.m.
Friday, May 5, 2023 at 05:05 pm
Categories: ConstructionBISMARCK, N.D. – Construction is scheduled to begin Monday, May 8, on Interstate 29 between mile points 202 and 204.
Tuesday, May 2, 2023 at 10:30 am
Categories: ConstructionBISMARCK, N.D. – Construction is scheduled to begin Monday, May 8, on U.S. Highway 52 south of Minot.
Monday, May 1, 2023 at 02:00 pm
Categories: ConstructionFARGO, N.D. – Lane closures began on May 1 on Interstate 29 from 3.5 miles south of the Grandin Interchange (Exit 92) to north of Blanchard Interchange (Exit 100).
Friday, April 28, 2023 at 02:27 pm
Categories: Road Conditions* Corrects spelling Juliette to Joliette.
BISMARCK, N.D. – The North Dakota Department of Transportation and North Dakota Highway Patrol are temporarily closing North Dakota Highway 5 from Joliette to the Red River today at 4 p.m. due to localized flooding.
Friday, April 28, 2023 at 12:15 pm
Categories: Road ConditionsBISMARCK, N.D. – The North Dakota Department of Transportation (NDDOT) is seeking bids for cutting, baling, and removing hay on designated sections of highway right of way along Interstate 94 and Interstate 29. Bids will be for the 2023 haying season.
Thursday, April 27, 2023 at 08:30 am
Categories: ConstructionBISMARCK, N.D. – Construction is scheduled to begin on Monday, May 1, on State Street and Bismarck Expressway.
Wednesday, April 26, 2023 at 04:45 pm
Categories: Construction
BISMARCK, N.D. – Construction is scheduled to begin Thursday, April 27, on U.S. Highway 83 northbound lanes, 15 miles south of Minot.