Question 2
The overall tonnage in the basis of estimate for the super pave is off by around 8 tons compared to the quantities within the table. Can you please clarify this? The Table quantities add up to 2886 and not 2894.
DOT Response
Sheet 20-1 has additional quantities that were added into the total quantities on the basis of estimate, but weren't given their own column.
Submitted: 11/29/2023 4:54:18 PM
Answered: 11/29/2023 5:08:47 PM
Question 1
In Section 110 on Sheet 1 stations 10+37 Rt & 10+37 Lt are listed as Flatsheet - Type XI. The signs listed are usually Type IV and there is no item for Flatsheet - Type IV. Confirm what sheeting type is required.
DOT Response
The signs at Sta 10+37 Rt should be Type IV sheeting. The sign at Sta 10+37 Lt is correct as Type XI sheeting. An addendum will be prepared for the signs at Sta 10+37 Rt.
Submitted: 11/22/2023 9:54:36 AM
Answered: 11/27/2023 1:53:59 PM