Question 8

Bid Item 049 W Beam Guardrail End Terminal was not addressed in Addendum 2. Will there be any further information available for this bid item prior to bid?

DOT Response

Addressed with Addendum.

Submitted: 12/6/2023 7:51:56 AM

Answered: 12/6/2023 3:28:34 PM

Question 7

How shall the required excavation of the existing embankment (prior to installation of the AGGREGATE BASE COURSE CL 5) for the temporary crossovers be paid for on PCN-22605? It's clear from the typical sections on section 30 sheet 2 that there will be some common excavation-waste to accommodate the proposed typical section (most notably from STA 2843+95.59 to 2848+48.44). Please clarify.

DOT Response

The intent is to remove the existing topsoil prior to placing the aggregate base for the crossover at STA 2843+95.59 to 2848+48.44 with the cost included in the “Topsoil” bid item.

Submitted: 12/4/2023 1:15:55 PM

Answered: 12/5/2023 8:20:44 AM

Question 6

How was the TOPSOIL (203-0109) bid item quantity calculated for PCN-22605? Plan Note 203-P01 indicates that this is for the median area after the REMOVAL OF TEMPORARY BYPASS occurs. Please clarify.

DOT Response

The Topsoil bid item includes removing the topsoil from the median before placement of the aggregate and Commercial Grade Asphalt for the crossover from STA 2843+95.59 to 2848+48.44 and replacing it after removing the crossover.

Submitted: 12/4/2023 11:31:30 AM

Answered: 12/5/2023 8:21:27 AM

Question 5

Plan Note 202-P01 for PCN-22605 directs the Contractor to return "the median to the condition, cross section, and profile existing before the start of the project...". The existing typical section for STA 2855+00 to STA 2860+00 on section 30 sheet 2 shows that there is currently 4" of bituminous pavement. Should the Contractor include the cost to replace or restor this pavement in the bid price for REMOVAL OF TEMPORARY BYPASS?

DOT Response

The intent is for the existing 4” Hot Mix Asphalt to remain in place with the aggregate and Commercial Grade Hot Mix Asphalt placed over the top of it for the crossover use. Then to remove the aggregate and Commercial Grade HMA when the crossover is no longer needed.

Submitted: 12/4/2023 11:14:54 AM

Answered: 12/5/2023 3:02:11 PM

Question 4

Was SPECIAL SURFACE FINISH (602-7000) for the existing barriers and new approach slab barriers for PCN-22605 intentionally omitted? Please clarify if this will be required.

DOT Response

The 602 note on Section 170 Sheet 17 says to apply surface finish on barrier on the bridge ends and approach slabs. No surface finish on existing barrier.

Submitted: 12/4/2023 10:47:12 AM

Answered: 12/4/2023 1:25:25 PM

Question 3

The plan sheets for PCN 22605 do not appear to identify the location(s) where the 75 SY of REMOVAL OF CONCRETE PAVEMENT (202-0114) is to take place. Please clarify.

DOT Response

An addendum will be provided with section 130 sheets identifying concrete pavement

Submitted: 12/4/2023 10:22:54 AM

Answered: 12/5/2023 3:03:55 PM

Question 2

Regarding bid items 049 W Beam Guardrail & 050 Remove & Reset Guardrail: There is no section 130 detailing this work. Will this be added prior to bid?

DOT Response

An addendum with Section 130 will be added.

Submitted: 12/1/2023 4:17:00 PM

Answered: 12/4/2023 1:10:05 PM

Question 1

The bid quantity for CURB & GUTTER-TYPE 1 for PCN 22605 appears to conflict with the quantities listed on section 20 sheets 1 and 2. The bid quantity lists 18 LF. The sum of quantities on the above referenced plan sheets is 74.5 LF. Please clarify. Thank you.

DOT Response

An Addendum will be provided.The bid quantity list should be 75.

Submitted: 12/1/2023 3:40:06 PM

Answered: 12/4/2023 1:45:05 PM