Bid Opening Date - December 08, 2023 9:30 AM CT

Submitted Questions for Job 23421 - SS-5-999(029)

Question 2

Cannonball River Bridge Sheet 170-14 Note 100 states that removal of the existing bridge rail is included in the scope of work. Which bid item is this incidental to?

DOT Response

The bottom of Sheet 170-13 under the Rail Removal Detail states: Include the removal of the existing rail retrofit in the contract unit price for "Double Box Beam Rail Retrofit - Free Standing."

Submitted: 12/5/2023 4:46:40 PM

Answered: 12/5/2023 5:18:53 PM

Question 1

Beings the T.C. for all six sites is listed under the same project number will it be paid as the "most items used at 1 time" or will all the items used on each bridge be paid separately even if only 2 or 3 bridges are set up at a time?

DOT Response

All traffic control signs and devices used on each bridge will be paid separately even if only 2 or 3 bridges are set up at a time. The same holds true for the LANE CLOSURE-SIGNAL CONTROL/FLAGGING CONTROL. Each site will be paid separately regardless of the number of sites worked on at one time. If flaggers are used in lieu of the signals, those flaggers will not be paid by the hour, rather they will be paid as LANE CLOSURE-SIGNAL CONTROL/FLAGGING CONTROL by the Each. Each site has one LANE CLOSURE-SIGNAL CONTROL/FLAGGING CONTROL regardless of the number of individual signals or flaggers required per site.

Submitted: 12/5/2023 11:48:00 AM

Answered: 12/5/2023 3:21:10 PM