North Dakota Work Zones **************************** Last Updated at: 11/19/2009 05:23 PM Highway Construction Areas 25. ND 294 MP: 0.000 to MP: 0.000 Project: FGO-12TH AVE N BNSF RAILROAD BRIDGE - STRUCTURAL WIDENINGS Comments: Two lanes of traffic on structure. One lane each direction. Speed limit 25 MPH. Width Restriction: 11.0 ft. 26. ND 14 MP: 115.000 to MP: 115.000 Project: MOUSE RIVER BRIDGE BY TOWNER - STRUCTURAL AND INCIDENTALS Comments: Roadway open to traffic and speed limit normal. 27. ND 14 MP: 116.000 to MP: 116.000 Project: 2 MI NW TOWNER - STRUCTURAL AND INCIDENTALS Comments: Temporary bypass is no longer in use, highway 14 is open to traffic with speed reduce to 45 mph. 28. ND 66 MP: 137.339 to MP: 138.720 Project: JCT 44 - DRAYTON EAST TO RED RIVER - STRUCTURAL AND INCIDENTALS Comments: Speeds reduced to 45mph through project. Single lane traffice controlled by flagging operation may be in place during daylight hours 29. I 94 MP: 347.000 to MP: 347.000 Project: W FGO 9TH STR & I94 OVERHEAD & RAMPS - STRUCTURAL ITEMS Comments: Work off of roadways. 31. ND 294 MP: 1.000 to MP: 2.000 Project: FARGO 12TH AVE (I-29 TO 10 STREET) - AGGREGATE BASE Comments: Road closed from 18th St to 9th St, intersections at University Drive and 10th St open. Follow Detours. Reduced speeds of 25 MPH Width Restriction: 11.0 ft. 33. US 81B MP: 921.000 to MP: 922.000 Project: FARGO-SO UNIV (40TH AVE TO 52ND AVE) - GRADE Comments: University Drive remains open to traffic with periodic delays controlled by flaggers. 40th Avenue to the west is closed and detoured to 15th Street at 37th Avenue South since Monday, July 20. 35. **UPDATED COMMENTS** US 2 MP: 144.000 to MP: 144.000 Project: BNRR OVERHEAD W EDGE MINOT WB - STRUCTURAL AND INCIDENTALS Comments: Head to head traffic in the eastbound lanes of Hwy 2 & 52 from RP 143.83 to RP 144.77 at the west edge of Minot. Traffic speeds reduced to 35 MPH through the construction zone. Width Restriction: 15.0 ft. 36. US 2 MP: 144.326 to MP: 144.326 Project: MINOT US 2/52 & W BURDICK EXPWY - FLASHING BEACON Comments: Nothing Reported 38. I 29 MP: 129.000 to MP: 136.000 Project: S OF ND 15 TO NEAR 32ND AVE-NB - PCC PAVEMENT Comments: Traffic normal. 42. I 29 MP: 69.000 to MP: 75.000 Project: N FARGO INTR N TO SHEYENNE RIVER-NB - PCC PAVEMENT Comments: I-29 SB Roadway from RP 68.585 to RP 75.236 has a signle lane closure. SB width restriction is 22'. Height restriction is 16.4' for NB & SB. I-29 NB & SB roadway from RP 79.000 to RP 80.000 has signle lane closure in the passing lane. 43. ND 41 MP: 73.417 to MP: 74.000 Project: VELVA MAIN ST(CENT AVE TO MOUSE RIV) - HOT BITUMINOUS SURFACING Comments: Main St. was open to traffic all week. Traffic movements were controlled by temporary signals from 2nd to the North Bridge. Speeds are 25 mph. One lane of traffic through Main St from 2nd to the bridge. Turning from Main St onto 3rd, 4th, Church, and Park Avenues is prohibited. 44. ND 41 MP: 73.417 to MP: 74.000 Project: VELVA MAIN ST - WATERMAIN Comments: Main St. was open to traffic all week. Traffic movements were controlled by temporary signals from 2nd to the North Bridge. Speeds are 25 mph. One lane of traffic through Main St from 2nd to the bridge. Turning from Main St onto 3rd, 4th, Church, and Park Avenues is prohibited 45. I 94 MP: 87.000 to MP: 97.000 Project: YOUNGMANS BUTTE-2 MI EAGLES NEST EB - PCC PAVEMENT Comments: Traffic is reduced to one lane on the EB and WB interstate from 3 miles East of Richardton (RP 88) to RP 101. Speeds reduced to 65mph. Width Restriction: 16.0 ft. 46. US 81B MP: 940.000 to MP: 940.000 Project: GRAND FORKS - 32ND AVE & COLUMBIA RD - LIFT STATION Comments: Nothing Reported 59. ND 1804 MP: 68.000 to MP: 70.000 Project: APPROX RP68 TO EAST OF DESERT ROAD - SAFETY Comments: Nothing Reported 60. ND 1804 MP: 70.000 to MP: 72.000 Project: JUST E OF DESERT RD N TO SIGNAL ST. - GRADE Comments: The speed limit has been restored to 55 MPH throughout the two projects from Signal Street to RP 68 which is approximately two miles east and south of Desert Road. Flaggers and pilot cars will be used as necessary to accomodate construction activities on or adjacent to the roadway. 77. US 83 MP: 159.621 to MP: 172.000 Project: NEAR JCT 37 N TO 0.6 MI N MAX-SB - GRADE Comments: Nothing Reported Width Restriction: 15.0 ft. 107. ND 95 MP: 0.000 to MP: 0.000 Project: E PARKING LOT-DOT BUILDING - PAVEMENT MARKINGS Comments: Project is completed. 126. US 52 MP: 222.719 to MP: 223.000 Project: CARRINGTON-2ND ST N TO 7TH ST S - GRADE Comments: Roadway narrowed for 0.62 miles within the city of Carrington. Head-to-Head Traffic. Width Restriction: 11.0 ft. 133. I 29 MP: 22.575 to MP: 44.126 Project: JCT 13 TO CHRISTINE INTR-NB - CPR Comments: Roadway construction has been completed. Pavement markings will be placed along the outside edgeline the week of 11/16/2009. Traffic will operate as normal. 134. I 29 MP: 22.575 to MP: 44.126 Project: JCT 13 TO CHRISTINE INTR-SB - CPR Comments: Road construction has been completed. The outside edgeline will be placed the week of 11/16/2009. Traffic will operate as normal. 164. ND 19 MP: 155.036 to MP: 155.036 Project: DEVILS LAKE ND 19 (US 2-ND 20) - MILL AND OVERLAY 2" MAX Comments: Hwy 19 will be closed from it's junction with Hwy 2, east to it's junction with Hwy 20, from 6:00 am until noon on Saturday, the 29th of August. 165. ND 19 MP: 155.036 to MP: 155.036 Project: DEVILS LAKE ND19(3RD AVE NW TO ND20) - ASPHALT OVERLAY 2" MAX + RUT FILLING Comments: Nothing Reported 166. ND 20 MP: 102.654 to MP: 104.000 Project: DEVILS LAKE ND 20 (US 2-URBAN LIMITS - MILL AND OVERLAY > 2" < OR = 3" Comments: Nothing Reported 167. ND 20 MP: 103.000 to MP: 103.348 Project: DEV LAKE ND20 (3RD ST NW-6TH ST NE) - ASPHALT OVERLAY 2" MAX + RUT FILLING Comments: Nothing Reported 175. ND 10B MP: 938.000 to MP: 940.000 Project: FARGO MAIN AVE (25TH ST-2ND ST N) - MILL AND OVERLAY 2" MAX Comments: Nothing Reported 180. ND 8 MP: 132.121 to MP: 155.962 Project: ND 23 TO US 2 AT STANLEY - RUMBLE STRIPES Comments: Moving operation only effects traffic temporarily 181. ND 23 MP: 50.000 to MP: 56.405 Project: NEW TOWN TO DISTRICT BNDRY - RUMBLE STRIPES Comments: Moving operation only effects traffic temporarily 182. ND 23 MP: 56.405 to MP: 74.000 Project: DISTRICT BNDRY TO PLAZA - RUMBLE STRIPES Comments: Nothing Reported 183. ND 49 MP: 74.000 to MP: 82.000 Project: I-94 TO DISTRICT BOUNDRY - RUMBLE STRIPES Comments: Nothing Reported 184. ND 49 MP: 82.000 to MP: 100.000 Project: DISTRICT BOUNDRY TO BEULAH - RUMBLE STRIPES Comments: Nothing Reported 185. ND 46 MP: 6.000 to MP: 6.000 Project: RP 6 - GRADE RAISE Comments: Speed Limit 35 MPH 186. ND 13 MP: 249.000 to MP: 249.000 Project: RP 249 - GRADE RAISE Comments: Nothing Reported 199. US 83B MP: 920.000 to MP: 922.000 Project: US 83 BYPASS SOURIS RIVER TO 4TH AVE - BIKEWAY/WALKWAY Comments: Nothing Reported 201. ND 1 MP: 143.000 to MP: 143.000 Project: 2 MI S OF PEKIN - RIPRAP Comments: Project Complete 202. ND 15 MP: 44.000 to MP: 46.000 Project: 7 MI W OF JCT ND 20 - RIPRAP Comments: Project Complete 211. ND 13 MP: 244.000 to MP: 244.000 Project: RP 244 - GRADE RAISE Comments: Nothing Reported Maintenance Activity Areas M-28.ND 20 MP: 96.000 to MP: 98.000 - Rip Rap Repair to Rip Rap Repair Project: Construction Comments: Rip Rap Repair along Hwy 20 with Flaggers and Pilot Car through Construction Zone.