North Dakota Width Height Restrictions ******************************************* Last Updated at: 11/19/2009 05:23 PM Highway Construction Areas 25. ND 294 MP: 0.000 to MP: 0.000 Project: FGO-12TH AVE N BNSF RAILROAD BRIDGE - STRUCTURAL WIDENINGS Width Restriction: 11.0 ft. Comments: Two lanes of traffic on structure. One lane each direction. Speed limit 25 MPH. 31. ND 294 MP: 1.000 to MP: 2.000 Project: FARGO 12TH AVE (I-29 TO 10 STREET) - AGGREGATE BASE Width Restriction: 11.0 ft. Comments: Road closed from 18th St to 9th St, intersections at University Drive and 10th St open. Follow Detours. Reduced speeds of 25 MPH 35. US 2 MP: 144.000 to MP: 144.000 Project: BNRR OVERHEAD W EDGE MINOT WB - STRUCTURAL AND INCIDENTALS Width Restriction: 15.0 ft. Comments: Head to head traffic in the eastbound lanes of Hwy 2 & 52 from RP 143.83 to RP 144.77 at the west edge of Minot. Traffic speeds reduced to 35 MPH through the construction zone. 45. I 94 MP: 87.000 to MP: 97.000 Project: YOUNGMANS BUTTE-2 MI EAGLES NEST EB - PCC PAVEMENT Width Restriction: 16.0 ft. Comments: Traffic is reduced to one lane on the EB and WB interstate from 3 miles East of Richardton (RP 88) to RP 101. Speeds reduced to 65mph. 77. US 83 MP: 159.621 to MP: 172.000 Project: NEAR JCT 37 N TO 0.6 MI N MAX-SB - GRADE Width Restriction: 15.0 ft. Comments: Nothing Reported 126. US 52 MP: 222.719 to MP: 223.000 Project: CARRINGTON-2ND ST N TO 7TH ST S - GRADE Width Restriction: 11.0 ft. Comments: Roadway narrowed for 0.62 miles within the city of Carrington. Head-to-Head Traffic. Maintenance Activity Areas No Maintenance Activity active at this time.