﻿<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom">
  <title type="text">North Dakota Travel Information - Reported Width/Height Restrictions</title>
  <subtitle type="text">Last reported width/height restrictions for the State of North Dakota</subtitle>
  <id>http://www.dot.nd.gov/travel-info-v2/georss/widthheight-ng.xml</id>
  <updated>2013-05-22T13:32:11-05:00</updated>
  <author>
    <name>NDDOT Road Reporters/CARS System</name>
    <uri>http://www.dot.nd.gov/travel-info-v2/</uri>
    <email>dot@nd.gov</email>
  </author>
  <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  <link rel="self" href="http://www.dot.nd.gov/travel-info-v2/georss/widthheight-ng.xml" />
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18691N,2013-04-29T16:56:16-05:00</id>
    <title type="text">I 29 N (MP: 147.226 to 152.337)</title>
    <summary type="html">N OF N GF INTER TO MANVEL - NB      &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 12.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; One lane closure. Speeds reduced to 40 mph where workers are present. Width restriction of 12'. Flaggers may be present.</summary>
    <updated>2013-04-29T16:56:16-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18340S,2013-05-16T07:24:37-05:00</id>
    <title type="text">I 29 S (MP: 118.012 to 129.539)</title>
    <summary type="html">BUXTON TO S OF ND 15-SB             &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Height - 16.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; SB roadway CLOSED.  Traffic diverted to head-to-head in NB roadway from MP 118 to MP 129.  Speed Limit 65 mph, 40 mph at times.  Buxton Interchange (Exit 118) bridge is CLOSED.  Please follow detour signs.</summary>
    <updated>2013-05-16T07:24:37-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-MA-100050S,2013-05-18T15:41:05-05:00</id>
    <title type="text">I 29 S (MP: 144.700 to 145.500)</title>
    <summary type="html">North Grand Forks Interchange&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 12.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Southbound driving lane closed due to bridge maintenance.  Traffic speeds reduced within lane closure to 45 mph.</summary>
    <updated>2013-05-18T15:41:05-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-17763S,2013-04-29T16:55:54-05:00</id>
    <title type="text">I 29 S (MP: 147.226 to 161.700)</title>
    <summary type="html">N OF N GF INTR - WALSH CO LINE - SB &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 12.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; One lane closure. Speeds reduced to 40 mph where workers are present. Width restriction of 12'. Flaggers may be present.</summary>
    <updated>2013-04-29T16:55:54-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-MA-100049S,2013-05-13T08:55:20-05:00</id>
    <title type="text">I 29 S (MP: 200.000 to 203.500)</title>
    <summary type="html">Joliette Interchange south approx 3 Miles.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 14.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; One lane closure for maintenance concrete pavement repair on driving lane which will begin on May 13.  The work is expected to last approx 2 weeks.  Traffic can expect reduced speeds through the work zone.</summary>
    <updated>2013-05-13T08:55:20-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18270E,2013-05-02T09:37:07-05:00</id>
    <title type="text">I 94 E (MP: 23.001 to 23.001)</title>
    <summary type="html">West River road bridges on I-94 east and westbound roadway at RP 23&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 14.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Watch for construction vehicles exiting roadway</summary>
    <updated>2013-05-02T09:37:07-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18270W,2013-05-02T09:37:07-05:00</id>
    <title type="text">I 94 W (MP: 23.001 to 23.001)</title>
    <summary type="html">West River road bridges on I-94 east and westbound roadway at RP 23&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 14.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Watch for construction vehicles exiting roadway</summary>
    <updated>2013-05-02T09:37:07-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-MA-100048E,2013-04-11T11:32:33-05:00</id>
    <title type="text">US 2 E (MP: 53.000 to 54.000)</title>
    <summary type="html">Through City of Ray&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 10.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Traffic is reduced to 2 lanes head to head.  10 ft width restriction both directions. For loads exceeding 10 feet in width please contact the Contractor Lakeshore Contracting - Dan Rodgers 701-339-8535.</summary>
    <updated>2013-04-11T11:32:33-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18594E,2013-05-16T10:28:05-05:00</id>
    <title type="text">US 2 E (MP: 150.841 to 171.742)</title>
    <summary type="html">55TH ST E TO 1.7 MI E GRANVILLE-EB  &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 11.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Guardrail work will began at Surrey on May 17, 2013. Reduced speed limit through work area.</summary>
    <updated>2013-05-16T10:28:05-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18611W,2013-05-13T09:53:43-05:00</id>
    <title type="text">US 2 W (MP: 20.383 to 31.954)</title>
    <summary type="html">Williams County Rd 7b to Williams County Rd 8            &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 11.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Intermittent work including roadway surface grinding, lane striping, and asphalt paving will be taking place and may require localized single lane closures at times.</summary>
    <updated>2013-05-13T09:53:43-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18756N,2013-05-19T17:44:03-05:00</id>
    <title type="text">US 81B N (MP: 940.093 to 941.990)</title>
    <summary type="html">GF 32ND AV S(NEAR I-29 - WASHINGTON)&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 12.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; One lane closed in each direction on 32nd Ave, with one lane remaining open to traffic in each direction. Lane closures extend from I-29 to just West of Columbia Rd. Speed reduced to 25 mph, with a width restriction of 12 feet.</summary>
    <updated>2013-05-19T17:44:03-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18756S,2013-05-19T17:44:03-05:00</id>
    <title type="text">US 81B S (MP: 940.093 to 941.990)</title>
    <summary type="html">GF 32ND AV S(NEAR I-29 - WASHINGTON)&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 12.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; One lane closed in each direction on 32nd Ave, with one lane remaining open to traffic in each direction. Lane closures extend from I-29 to just West of Columbia Rd. Speed reduced to 25 mph, with a width restriction of 12 feet.</summary>
    <updated>2013-05-19T17:44:03-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-17708N,2013-05-01T13:55:13-05:00</id>
    <title type="text">US 83 N (MP: 0.000 to 15.300)</title>
    <summary type="html">STATE LINE N TO STRASBURG           &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 16.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Widening on both sides of the road. Beginning on south end of the project. As the work progresses, multiple gravel surface areas will appear. Use caution when approaching areas indicating pavement breaks.</summary>
    <updated>2013-05-01T13:55:13-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-19725N,2013-05-21T16:11:06-05:00</id>
    <title type="text">US 85 (MP: 63.011 to 63.011)</title>
    <summary type="html">Bridge on US 85 south of Belfield at RP 63        &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Height - 18.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Watch for construction vehicles exiting roadway. </summary>
    <updated>2013-05-21T16:11:06-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18263N,2013-05-21T16:12:14-05:00</id>
    <title type="text">US 85 (MP: 72.196 to 74.540)</title>
    <summary type="html">Bridge on US 85 south of Belfield at RP 72 &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Height - 17.5 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Watch for construction vehicles exiting roadway</summary>
    <updated>2013-05-21T16:12:14-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18106N,2013-05-10T12:13:20-05:00</id>
    <title type="text">US 281 N (MP: 178.849 to 189.738)</title>
    <summary type="html">3 MI N CHURCHS FERRY TO CANDO       &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 11.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Hot Bituminous Paving to Began May 13, 2013.  Pilot Car and Flaggers will direct traffic thru the work area</summary>
    <updated>2013-05-10T12:13:20-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-19207N,2013-05-21T16:48:52-05:00</id>
    <title type="text">ND 8 (MP: 174.140 to 197.124)</title>
    <summary type="html">HWY 8, ND 50 TO US 52                      &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 12.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Construction Work occurring within the City of Bowbells.  Expect delays within City.  Ditch work occurring north of ND 50 outside of roadway. Contact # for Project Superintendent Jason (701) 866-0403.</summary>
    <updated>2013-05-21T16:48:52-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-18848E,2013-05-21T11:03:23-05:00</id>
    <title type="text">ND 13 E (MP: 263.332 to 278.119)</title>
    <summary type="html">E JCT 56 E TO US 281                &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 12.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; At the location of the work, there will be one lane open to traffic. A flagger and pilot car will assist the traffice throught the one lane section. Slow down and come to a stop when the flagger is encountered and wait for the pilot car to guide you through the work zone.</summary>
    <updated>2013-05-21T11:03:23-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-19836N,2013-05-07T14:55:32-05:00</id>
    <title type="text">ND 22 N (MP: 88.000 to 91.000)</title>
    <summary type="html">NEAR STARK CO LINE TO NEAR RP 91    &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 12.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Work taking place on shoulders, please reduce speed. Speed limits will be reduced to 25mph for bridge reconstruction from RP 90.7 to 90.9. Traffic may be reduced to one lane in this area with flaggers or pilot car present between 7:00PM to 5:00AM.  </summary>
    <updated>2013-05-07T14:55:32-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-19205E,2013-05-15T10:46:30-05:00</id>
    <title type="text">ND 23 (MP: 56.405 to 66.370)</title>
    <summary type="html">ND 8 TO ND 37                       &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 15.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Reduced speeds when signs posted along route. Flaggers may be present.</summary>
    <updated>2013-05-15T10:46:30-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-19375E,2013-05-17T15:29:05-05:00</id>
    <title type="text">ND 23 (MP: 66.370 to 78.359)</title>
    <summary type="html">ND 37 TO CO LINE                    &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 12.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; Shoulder work including top soil removal will begin at the Mountrail/Ward County Line on May 20,2013. Reduced speed limit through the work area.</summary>
    <updated>2013-05-17T15:29:05-05:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
  <entry>
    <id>tag:www.dot.nd.gov,2011-05-11:widthheight-WZ-CN-17734E,2013-02-19T08:17:27-06:00</id>
    <title type="text">ND 26 (MP: 12.634 to 12.734)</title>
    <summary type="html">9 WEST OF ND 32 at Sibley.                  &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Restrictions associated with work zone:&lt;/strong&gt;&amp;nbsp;Width - 12.0 ft.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;strong&gt;Comments:&lt;/strong&gt; The project will be constructed under traffic. Traffic flow will be reduced to one lane traffic. Traffic control including advanced warning, stop bars, and stop lights will be used.</summary>
    <updated>2013-02-19T08:17:27-06:00</updated>
    <link rel="alternate" href="http://www.dot.nd.gov/travel-info-v2/" />
  </entry>
</feed>